CLIA 2567 GuideThe CMS-2567 for clinical labs, explained Book a free consultation
Home › RSV

Responding to a RSV (Respiratory Syncytial Virus) Testing Deficiency on the CMS-2567

A strong plan of correction for a RSV finding names the fix, shows a look-back for affected patient results, changes the system that failed, assigns monitoring and gives a completion date, with the RSV records that prove it attached.

Last reviewed Nov 24, 2026 · By the Sound Lab Consultants regulatory team · Sources listed below

What a RSV plan of correction should cover

CMS returns plans that only promise to do better. Plans of correction generally need to explain:

  1. The fix: what was corrected for RSV and when.
  2. The look-back: how you found other RSV results or patients that may have been affected, and what you did about them.
  3. The system change: the procedure, training or software change that keeps it from happening again.
  4. The monitor: who checks it, how often, and where it is reported (for example to the laboratory director or QA meeting).
  5. The date: a realistic completion date for each item.

Evidence to attach for RSV

RSV PT and accuracy

No analyte-level limit; nonwaived labs enroll in virology PT for the services they perform (42 CFR 493.919). If the finding involves PT, include the investigation of each unacceptable result and the remedial action taken; routine chemistry rules require that documentation be kept for two years (42 CFR 493.841).

Common root causes behind RSV findings

Related tests

Full guide: RSV (Respiratory Syncytial Virus) Testing testing in the clinical lab: CLIA, PT and QC requirements on soundlabconsult.com, part of the Laboratory Test Compliance Library.

For laboratory compliance and operations only, not medical advice or patient care guidance.

Received a 2567? Talk it through with a CLIA consultant

Sound Lab Consultants reviews CMS-2567 findings with laboratory directors, works through root causes and helps draft plans of correction and allegations of compliance.

Book a free consultation

Related guides on soundlabconsult.com:

Frequently asked questions

How do I write a plan of correction for a RSV deficiency?

State the correction, the look-back for affected RSV results, the system change, the monitoring and a completion date, and attach the supporting records.

What records support a RSV plan of correction?

Daily RSV QC records, Levey-Jennings charts, corrective action log, control lot ranges; RSV PT enrollment, attestation statements, graded reports, investigation of every miss; RSV verification study: accuracy, precision, reportable range, reference interval check, director sign-off.

Where is the plan of correction written?

On Form CMS-2567, the Statement of Deficiencies and Plan of Correction, or in the format your state agency or accrediting organization specifies.

Sources

More on CLIA 2567 Guide