The CMS-2567 10-day deadline and the full CLIA timeline
The state agency sends the CMS-2567 within 10 working days after the survey. The laboratory then has 10 calendar days from receipt to return its plan of correction or allegation of compliance. Standard-level corrections must be finished within 12 months of the survey; immediate jeopardy and condition-level findings run on much shorter tracks.

Timeline at a glance
| Step | Time frame | Source |
|---|---|---|
| Survey exit conference | Last day of the survey | SOM Chapter 6 |
| SA sends Form CMS-2567 | Within 10 working days after the survey | SOM Chapter 6 §6132 |
| Lab returns plan of correction or allegation of compliance | 10 calendar days from receipt | SOM Chapter 6 §6132; Form CMS-2567 instructions |
| Standard-level corrections completed | Within 12 months after the last day of inspection | 42 CFR 493.1816 |
| Hearing request after a sanction notice | Within 60 days of receiving the notice | 42 CFR 493.1844 and 42 CFR Part 498 |
Counting the 10 days
The clock starts when the laboratory receives the form, not on the survey date. Record the date of receipt (email timestamps help) and put the due date on the director's calendar the same day. If the full plan cannot be finished in time, SOM Chapter 6 §6132.2 expects a preliminary plan within the 10 days, followed by a more specific plan as early as possible. Missing the deadline gives the agency grounds to treat the deficiencies as uncorrected.
Standard-level track
When only standard-level deficiencies are cited, the lab submits a plan of correction acceptable to CMS in content and time frames. Completion dates can be in the future, but they must be realistic and fall within 12 months of the survey. Under §493.1816, if the deficiencies are not corrected within 12 months after the last day of inspection, CMS cancels the laboratory's approval to receive Medicare payment and notifies it of intent to suspend, limit or revoke the certificate.
Condition-level track
When a condition is not met, the lab answers with a credible allegation of compliance: a statement, with evidence, that the problem is already corrected. Future dates are not accepted for the condition or the standards under it. CMS may impose alternative sanctions such as a directed plan of correction, state onsite monitoring or civil money penalties, or principal sanctions under §493.1806. See condition vs standard-level.
Immediate jeopardy
If the surveyor finds immediate jeopardy, the timeline compresses. Under 42 CFR 493.1812, CMS requires the laboratory to take immediate action to remove the jeopardy and may impose sanctions quickly, including suspension or limitation of the certificate. Treat any immediate jeopardy notice as a same-day priority.
A 10-day working plan
- Days 1–2: log receipt, assign an owner per D-tag, pull the Appendix C guidance for each tag.
- Days 2–5: root cause for each finding, look-back to find other affected patients or records, decide the systemic fix.
- Days 5–8: write entries with the four required elements and realistic dates; gather evidence for any condition-level allegation.
- Days 8–9: director review and signature.
- Day 10 at the latest: return the signed original to the surveying agency and keep a copy with proof of delivery.
Received a 2567? Talk it through with a CLIA consultant
Sound Lab Consultants reviews CMS-2567 findings with laboratory directors, works through root causes and helps draft plans of correction and allegations of compliance.
Related guides on soundlabconsult.com:
Frequently asked questions
Is the CMS-2567 deadline 10 calendar days or business days?
The laboratory's response is due 10 calendar days after it receives the form. The 10 working days figure is the agency's time to send the form after the survey.
Can I get an extension on a CLIA plan of correction?
SOM Chapter 6 expects at least a preliminary plan within 10 days, followed by a more specific plan as early as possible. Ask the surveying agency in writing before the deadline if you need more time.
What happens if I miss the 10-day deadline?
The agency can treat deficiencies as uncorrected, which can move the laboratory toward enforcement. Respond as soon as possible and document the reason for the delay.
How long do I have to correct standard-level deficiencies?
Corrections must be completed within 12 months after the last day of the inspection under 42 CFR 493.1816.