How to read a CMS-2567, field by field
Read each citation in five parts: the D-tag, the 42 CFR citation, the requirement text, the statement that it was not met, and the evidence. Then answer that exact tag on the right side with a dated correction. The tag tells you which paragraph of 42 CFR 493 and which Appendix C guidance the surveyor used.

The header block
The top of the form identifies the laboratory and the survey: the provider or supplier name and address, the CLIA identification number, the date the survey was completed, and the type of survey. Check every identifier first. A wrong CLIA number or address on a public document is worth correcting with the surveying agency before anything else.
The ID prefix tag
Each citation begins with a data tag that starts with D, such as D5413 or D2016. The tag maps to a paragraph of 42 CFR Part 493 and to the regulation text, interpretive guidelines and survey probes for that requirement in SOM Appendix C. Look up the tag before you write a word. The guidance tells you what the surveyor was trained to look for.
The five parts of every citation
Under CMS's Principles of Documentation, a deficiency on the left side has five parts. Reading them in order shows exactly which words of the rule were missed and how far the problem reached.
| Part | What to look for |
|---|---|
| 1. D-tag | The requirement and whether it is a condition or a standard |
| 2. Regulation citation | The 42 CFR 493 section and paragraph |
| 3. Requirement language | The specific words of the rule the lab is cited under |
| 4. "Not met" statement | The explicit statement that the requirement was not met |
| 5. Evidence | A deficient practice statement, then the findings: records reviewed, interviews, observations, counts and dates |
Reading the evidence
The findings usually say how the surveyor knows: "based on record review and interview", followed by the records sampled. Note the scope. A finding that covers one analyte in one month is a different correction from a finding that covers every test system. Your plan must address every instance named and explain how you looked for others.
The right-hand column
Answer each tag on the same row. A complete entry covers the four elements CMS requires in SOM Chapter 6 §6132.2: action for patients affected, how other affected patients were identified, the systemic change, and how the fix is monitored. Each entry needs a completion date. Disagreement with a finding can be stated and documented, but a plan and time frame are still required.
Signature and return
The laboratory director or authorized official signs and dates the form, keeps a copy and returns the signed original to the surveying agency within 10 calendar days of receipt, per the form instructions. Because the form is public, CMS guidance says the plan must not refer to another laboratory or malign an individual.
Received a 2567? Talk it through with a CLIA consultant
Sound Lab Consultants reviews CMS-2567 findings with laboratory directors, works through root causes and helps draft plans of correction and allegations of compliance.
Related guides on soundlabconsult.com:
Frequently asked questions
What is the ID prefix tag on a CMS-2567?
It is the D-tag that identifies the CLIA requirement cited. The same tag is repeated in the plan of correction column so each answer lines up with its deficiency.
Where can I look up what a D-tag means?
CMS State Operations Manual Appendix C gives the regulation text, interpretive guidelines and probes for each CLIA tag.
Can I disagree with a finding on the 2567?
Yes. You can state your disagreement and provide documentation, but CMS guidance still expects a plan of correction and time frame for the cited deficiency.
Should the plan of correction name staff members?
Use job titles, not names. CMS guidance says the plan must not malign an individual, and the form becomes public.